System

Wet-on-wet

System

Wet-on-wet

Ultraflex Wet-on-wet is a waterproofing membrane designed to be used for new work and re-roofing to guarantee a solid and consistent membrane with fast application. Once the matting is encapsulated the roof is showerproof even before the membrane has cured.

Application of wet-on-wet system

  1. Apply when ambient temperature is minimum of 2 degrees and rising and not exceeding 30°C.
  2. Ensure substrate is in good condition, dry, clean and free from dust, moss or lichen.
  3. All edge trims to be fixed to substrate prior to application of Ultraflex.
  4. Ultraflex is self-terminating, if brickwork is in good condition, strike a line using tape on the brickwork to coat up to (important: when the Ultraflex has been installed ensure the tape is pulled before the Ultraflex is dry). If the brickwork is in poor condition a termination bar or flashing is required.
  5. Open tin and mix thoroughly before using.
  6. Apply Ultraflex straight out of the can onto the substrate using a solvent resistant roller. Dry roll ULTRAFLEX MATTING into the product until the Ultraflex is drawn through, then immediately apply another coat of Ultraflex ensuring the matting is fully embedded avoiding any pinholes.
  7. It is advised to start at the perimeter of the area including upstands to a minimum of 150mm (if possible), ensuring the matting overlaps any trims (including fixings) / joints / change of material by 50mm.
  8. Infill the remaining field area using the same method as above using Ultraflex matting, at a minimum coverage rate of 1.5kg per m2. The whole area including trims must be coated to form a continuous seamless membrane. Please take time to make sure no pin holes exist. Drying time will be approx. 2-8 hours depending on weather, fully cured in 24 hours.
    Coverage: A drum of Ultraflex will cover 8 to 10 sqm depending on the surface. Please note this coverage may be affected by the contractor experience in applying Ultraflex system.
  9. ULTRATOP: apply a layer of Ultratop topcoat for glossy finish once the ultraflex is fully cured and no later than 48 hours after Ultraflex application.

**COLD ROOF
When applying Ultraflex on a OSB cold roof, please ensure there is sufficient ventilation within the roof structure to avoid moisture and condensation damaging the support. If you are unsure about the ventilation we recommend installing our metal-lined self-adhesive VCL directly onto the support.